Detailed Office Reinstatement Pricing Guide — Cost Per Square Foot, Itemised Breakdowns, and Budget Examples
Office Reinstatement Cost Guide
Office reinstatement is the most common type of reinstatement project in Singapore, and the question we get asked most often is: “How much will it cost?” This page provides a detailed breakdown of office reinstatement costs — by unit size, by scope item, and by complexity level. Use this to build a realistic budget before your site assessment.
Minimal partitions, simple dismantling and repainting. Partitions, ceilings, flooring, electrical removal and painting. Extensive M&E, raised floors, aircon and full restoration. Indicative budgeting ranges only. A site assessment is required for a fixed quotation. Minimal partitions, simple dismantling and repainting. Partitions, ceilings, flooring, electrical removal and painting. Extensive M&E, raised floors, aircon and full restoration. Indicative budgeting ranges only. A site assessment is required for a fixed quotation. Minimal partitions, simple dismantling and repainting. Partitions, ceilings, flooring, electrical removal and painting. Extensive M&E, raised floors, aircon and full restoration. Indicative budgeting ranges only. A site assessment is required for a fixed quotation. Industry cost ranges for office reinstatement in Singapore: These align with published industry data from Zoro Interior, GetContractor.sg, and Hacking SG. Indicative total costs for office reinstatement: Figures are indicative. The per-square-foot rate typically decreases for larger floor areas due to efficiency of scale. Understanding where the cost goes helps you evaluate quotations and identify what is driving the price: Partition wall removal: S$400 – S$1,200 per wall depending on type (drywall vs. brick), size, and cable content. A typical office with 8 to 12 partition walls: S$3,200 – S$14,400. False ceiling removal: S$1.50 – S$3.50 per square foot. Carpet or vinyl floor removal: S$1 – S$3 per square foot. Workstation and furniture dismantling: S$500 – S$3,000 depending on quantity. Built-in carpentry removal: S$200 – S$1,000 per unit. Power point and data point removal: S$60 – S$120 per point, including cable termination and trunking removal. Lighting fixture removal: S$80 – S$150 per point. Air-conditioning unit removal: S$250 – S$600 per indoor unit (FCU or cassette); S$300 – S$800 per outdoor condenser. Ducting removal: S$5 – S$15 per linear metre depending on duct size and accessibility. Wall patching and repainting: S$2 – S$5 per square foot of wall area (not floor area — wall area is larger). Ceiling patching and repainting: S$1.50 – S$3 per square foot of ceiling area. Full skim coat plastering: additional S$1 – S$2 per square foot of wall area — recommended for walls with extensive patching. Disposal fees: S$500 – S$1,500 per project depending on volume and number of trips. Larger volumes, heavier materials (brick, concrete, screed), and sites with difficult access increase disposal cost. PE Endorsement: S$500 – S$1,500 (if required) — paid directly to the PE. Building management submission fee: S$100 – S$500 — varies by building. MCST renovation deposit: S$1,000 – S$5,000 — refundable. Hoarding board installation: S$300 – S$1,500 depending on opening size and material specification. S$200 – S$800 — included in our reinstatement package; priced separately for standalone cleaning. Minimal partitions (3 drywall walls), carpet tiles, standard electrical, no false ceiling. Estimated cost: S$6,000 – S$9,000 (S$4 – S$6 psf) 8 drywall partitions, 2 glass meeting rooms, false ceiling throughout, carpet tiles, standard electrical, 4 FCUs. Estimated cost: S$14,000 – S$22,000 (S$7 – S$11 psf) 20+ partitions including glass, raised access flooring, false ceiling with integrated lighting and aircon, extensive electrical fit-out, multiple FCUs and ducting. Estimated cost: S$60,000 – S$100,000+ (S$12 – S$20+ psf) Scenarios are illustrative. Actual costs depend on site conditions and landlord requirements. Every office reinstatement quotation we provide is fixed. No variation charges unless you add to the scope. No hidden fees revealed on the final invoice. No ambiguity about what is included and what is not. We put everything in writing after a thorough site assessment. We provide a free site survey and a detailed, itemised, fixed-price quotation. The site visit takes about 30 to 60 minutes. You will receive a written quotation with a full scope breakdown, timeline, and payment terms. No obligation. Why is there such a wide cost range for office reinstatement? Because every office fit-out is different. Two identical units in the same building can have completely different reinstatement costs if one tenant installed glass partitions, raised flooring, and zone-controlled air-conditioning while the other kept the space largely open-plan. The variables — walls, ceiling, floor, electrical, aircon — multiply. A site assessment is the only way to get an accurate price. Is the per-square-foot cost based on floor area or wall area? Floor area (GFA — gross floor area of the unit). Wall area, ceiling area, and specific item quantities drive the total cost, but the psf rate is calculated against the unit's floor area for easy comparison. This is the industry standard in Singapore. How do your prices compare to other reinstatement contractors? Our prices are competitive for the level of service and guarantee we provide. We are not the cheapest and we are not the most expensive. What differentiates us: fixed price (no variation games), direct workforce (no subcontractor markups), licensed tradesmen for all electrical and aircon work, and a track record of first-time handover passes. Can you give me a rough estimate over the phone before committing to a site visit? We can provide the indicative ranges on this page over the phone, but we cannot give a project-specific estimate without seeing the unit. The gap between the low end and high end of the range is too wide to be useful for budgeting. A site assessment takes 30 to 60 minutes and gives you a firm, usable number. What if my reinstatement scope changes after the quotation is issued? If the scope changes — for example, the landlord adds requirements after reviewing the reinstatement plan — we issue a revised quotation for the additional scope. The original scope remains at the original fixed price. You approve any changes before we proceed.Office Reinstatement Cost at a Glance
Office Reinstatement Cost at a Glance
Office Reinstatement Cost at a Glance
Office Reinstatement Cost Per Square Foot
Complexity Level
Cost per sqft
What’s Typically Included
Basic
S$3 – S$5
Minimal partitions, basic dismantling, wall patch and repaint, no major M&E
Standard
S$5 – S$12
Partitions and false ceiling removal, carpet/vinyl removal, electrical point removal, full repaint, disposal
Complex
S$12 – S$30+
Full dismantling of partitions and ceilings, raised flooring removal, extensive M&E, aircon and ducting removal, full restoration
Cost By Office Size
Office Size
Basic (S$4 psf)
Standard (S$8 psf)
Complex (S$15 psf)
Complex Large (S$20+ psf)
500 sqft
S$2,000
S$4,000
S$7,500
S$10,000+
1,000 sqft
S$4,000
S$8,000
S$15,000
S$20,000+
1,500 sqft
S$6,000
S$12,000
S$22,500
S$30,000+
2,000 sqft
S$8,000
S$16,000
S$30,000
S$40,000+
3,000 sqft
S$12,000
S$24,000
S$45,000
S$60,000+
5,000 sqft
S$20,000
S$40,000
S$75,000
S$100,000+
Itemised Cost Breakdown
Dismantling and Removal
Electrical and M&E
Surface Restoration
Debris Disposal
Permits and Professional Fees
Post-Reinstatement Cleaning
What Makes An Office More Expensive To Reinstate
What Makes An Office Less Expensive To Reinstate
Sample Budget Scenarios
Scenario A: 1,500 sqft Open-Plan Office
Scenario B: 2,000 sqft Subdivided Office
Scenario C: 5,000 sqft Full-Floor Corporate Office
Fixed Price Means Fixed Price
Enquire About Your Office Reinstatement Cost
Related Reinstatement Services
Frequently Asked Questions
